I cannot begin to tell you how excited I am that the master bathroom is done! The changes we made have made the biggest difference. Before I share it with all of you, lets take a look at the before.
And now the after.
We purchased the vanity cabinet, double sink vanity top, faucets and two lighting fixtures at Lowes. The oval mirrors were purchased at Wal-Mart.
I used a curtain instead of a shower curtain because I could not find anything I liked. The window curtain was one panel that I cut in half.
I think what makes the biggest difference in this bathroom has to be the tile behind the tub/shower stall and the flooring.
This was not the original floor we ordered. We ordered the peel, place and press floating vinyl planks manufactured by Armstrong. Instead we received the Swift Lock Vinyl Planks by Armstrong. Installing them was easy and it only took Charlie and I a couple of hours to do.
I still need to hang the towel bar above the vanity stool.
It was a lot of work but I think it was well worth the work!
As always thanks for visiting and for your sweet comments. They are always appreciated.
Gail
Linking this post to:
Savvy Southern Style for WOW Us Wednesday
DIY by Design for Winter Blues Wednesday
No Minimalist Here for Open House Party
The Shabby Creek Cottage for Transformation Thursday
French Country Cottage for Feathered Nest Friday
At The Picket Fence for Inspiration Friday
2805 for Potpourri Party
No comments:
Post a Comment